Permanent Case Studies
Large Permanent Kitchen at HMP Wayland
PKL Group assembled a prison kitchen for a temporary custodial facility built alongside pre-existing prison buildings. Working to a tight deadline, PKL provided a 560m ² System Kitchen to site, only 13 weeks after receiving [...]
100 KitchenPod Facilities in Northamptonshire
PKL has supplied a total of 100 KitchenPods to schools in Northamptonshire as part of the County Council’s Hot School Meals programme, designed to increase the nutritional quality of school meals. Northamptonshire County Council embarked [...]
KitchenPod at Whitemoor School
Whitemoor School in Nottingham required a large, permanent kitchen facility to provide hot meals to pupils and staff. With a tight budget, and without the possibility of undertaking major building work, Nottingham City Council needed [...]
Passmores Academy Food Cube
With more than 1,000 students aged 11 – 16 years old enrolled at the Academy, and a growing intake of around 230 students each year, Passmores Academy called on modular kitchen specialists, PKL, to increase [...]
KitchenPod and Food Cube at ZSL London Zoo
When ZSL London Zoo came to upgrade some of its catering arrangements, head of catering Steve Perkins called on PKL for advice, having worked with the modular and temporary kitchens supplier before. Now with the [...]
Food Cube at Fairfield School
A Food Cube from PKL Group at Fairfield High School for Girls, in Manchester, has been a well-received by staff and students alike. The Food Cube reduces queuing times in the main dining area and [...]